Muzdalifa — Water infrastructure

Firefighting WaterTank

A 20,000 m³ firefighting reservoir cut into the hillside at Muzdalifa, roofed with pre-cast tiles and beams on 150 internal columns — completed in five months.

03 / 07

Specification

Contract value
23,500,000 SAR
Completion date
2007
Project duration
5 months
Tank capacity
20,000 m³
Volume of concrete
15,000 m³
Excavation
200,000 m³

Construction notes

  • Retaining walls.
  • The roof is made of pre-cast tiles and beams based on 150 internal columns.