Bridge at Abdul Aziz Street
An elevated carriageway on one of Jeddah’s principal arterial routes, delivered in sixteen months.
- Project duration
- 16 months
- Configuration
- 1 direction, 2 traffic lanes
Track record
Seven completed packages across Jeddah, Muzdalifa, Taif, Tabuk and Riyadh — bridges, underpasses, water retention and intersections — and four more under way.
An elevated carriageway on one of Jeddah’s principal arterial routes, delivered in sixteen months.
A grade-separated intersection carrying three lanes in each direction, built over eighteen months.
A 20,000 m³ firefighting reservoir cut into the hillside at Muzdalifa, roofed with pre-cast tiles and beams on 150 internal columns — completed in five months.
A circular reservoir at Taif delivered complete with its civil and electromechanical works.
A 700 m bridge on pre-cast post-tensioned U-girders over an 800 m top-down underpass, completed February 2018.
A 750 m bridge carrying three lanes in each direction, built over a twenty-four month programme.
A wadi crossing carrying four lanes in each direction, founded in rock and delivered over twenty-four months.
On site now
An example of excellence in executing projects.
Our on-going projects are an example of our style of managing projects. A glance at the mechanism and sequential order of the project reflects our ways and means of handling projects.