Tabuk — Bridge
Omar Bin KhatabBridge
A 750 m bridge carrying three lanes in each direction, built over a twenty-four month programme.
06 / 07



Specification
- Contract value
- 52,000,000 SAR
- Project duration
- 24 months
- Length
- 750 m
- Configuration
- 2 directions, 3 traffic lanes each
- Volume of concrete
- 12,000 m³
- Excavation
- 50,000 m³
- Steel
- 3,000 tons