Tabuk — Bridge

Omar Bin KhatabBridge

A 750 m bridge carrying three lanes in each direction, built over a twenty-four month programme.

06 / 07

Specification

Contract value
52,000,000 SAR
Project duration
24 months
Length
750 m
Configuration
2 directions, 3 traffic lanes each
Volume of concrete
12,000 m³
Excavation
50,000 m³
Steel
3,000 tons

A 750 m bridge carrying three lanes in each direction, built over a twenty-four month programme.